![](https://static.wixstatic.com/media/11062b_8a8ef7c376d04abead9b15371ed93d5e~mv2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/11062b_8a8ef7c376d04abead9b15371ed93d5e~mv2.jpg)
Semi-Conductor Plant
Project Overview:
A multinational semiconductor factory in Shenzhen, China, specialises primarily in the production of automotive PC board-specific products. The key performance of production environment is to be maintained at a constant temperature and humidity. The annual energy consumption of the chiller plant room is approximately 3.7MKH.
Building Automation System:
The site is digital ready which has a Mitsubishi PLC control system together with Energy meters.
Solution:
Installed a NDE (Network Data Engine) - AI gateway on site and connected to the Mitsubishi PLC system. Installed additional NDE interfacing with Chiller Control Panel.
Achievement:
Energy Saving achievement is based on the M&V (Measurement & Verification) from comparison of 2 adjacent days, the energy saving achievement has been verified. The actual savings rate ranges from 13% to 18%, with an average savings rate of approximately 15%.